Discover Opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Abandon and remove foundation and site piping, and replace existing pump station. Upgrade water systems including: Abandon a section of existing water distribution system; construct approx 200’ of new water distribution pipelines; install two isolation valves; construct a new distribution pump station with new electrical, pumping equipment, standby gas generator, and all other equipment; construct site improvements including masonry pavers and landscaping; and provide on-site stormwater management, facility startup, and testing.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Equipment covered by this bid includes the manufacture, delivery and start-up services for the Poquito Pump Station Replacement - Pump Station and Controls (Equipment Only).
Posted Date
Dec 8, 2025
Due Date
Jan 7, 2026
Release: Dec 8, 2025
Close: Jan 7, 2026
Equipment covered by this bid includes the manufacture, delivery and start-up services for the Poquito Pump Station Replacement - Pump Station and Controls (Equipment Only).
AvailablePremium
Access the largest public sector contact database
Replacement of an existing raw sewage pump station.
Posted Date
Nov 11, 2025
Due Date
Jan 6, 2026
Release: Nov 11, 2025
Close: Jan 6, 2026
Replacement of an existing raw sewage pump station.
AvailableThe Project consists generally of the following major items: Replacement of five pump station backup generators and other improvement.
Posted Date
Oct 17, 2025
Due Date
Dec 11, 2025
Release: Oct 17, 2025
Close: Dec 11, 2025
The Project consists generally of the following major items: Replacement of five pump station backup generators and other improvement.
Replacement of the pumping station including the installation of two new pumps and controls, grinder pit and valve vault, and new flowmeter and including piping, valves, and electrical work as shown on the drawings and as specified, and the replacement of the forcemain in the same trench. This includes bypass pumping and demolition of existing equipment.
Posted Date
Nov 10, 2025
Due Date
Dec 17, 2025
Release: Nov 10, 2025
Close: Dec 17, 2025
Replacement of the pumping station including the installation of two new pumps and controls, grinder pit and valve vault, and new flowmeter and including piping, valves, and electrical work as shown on the drawings and as specified, and the replacement of the forcemain in the same trench. This includes bypass pumping and demolition of existing equipment.