Discover opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Replacement of an existing raw sewage pump station.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
No files attached to this RFP.
Many agencies add documentation later or require FOIA requests. Starbridge can automatically retrieve these files for you.
Equipment covered by this bid includes the manufacture, delivery and start-up services for the Poquito Pump Station Replacement - Pump Station and Controls (Equipment Only).
Posted Date
Dec 8, 2025
Due Date
Jan 7, 2026
Release: Dec 8, 2025
Close: Jan 7, 2026
Equipment covered by this bid includes the manufacture, delivery and start-up services for the Poquito Pump Station Replacement - Pump Station and Controls (Equipment Only).
AvailablePremium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Work of this project consists of the installation of a new force main and replacement/rehabilitation of existing gravity sewer, that will eventually connect into the newly constructed pump station.
Posted Date
Nov 11, 2025
Due Date
Jan 6, 2026
Release: Nov 11, 2025
Close: Jan 6, 2026
Work of this project consists of the installation of a new force main and replacement/rehabilitation of existing gravity sewer, that will eventually connect into the newly constructed pump station.
AvailableWork includes: Demolish existing and construct new municipal water pump station and building; new site work; backup generator; flow meters, valves, pump, and motor replacement; mechanical piping; electrical pressure sensors; lighting; variable frequency drives; instrumentation and controls.
Posted Date
-
Due Date
Jan 6, 2026
Release: -
Close: Jan 6, 2026
Work includes: Demolish existing and construct new municipal water pump station and building; new site work; backup generator; flow meters, valves, pump, and motor replacement; mechanical piping; electrical pressure sensors; lighting; variable frequency drives; instrumentation and controls.
AvailableWork includes construction of a new pumping station, including a new wet well, raw sewage pumps, pump controls, and all other appurtenances, as well as the installation of a valve and metering vault, emergency generator, and telemetry equipment. Project also includes the selective demolition of existing pump station equipment. Also included is the replacement of approx 1,500 LF of force main with new 4" pipe.
Posted Date
Nov 13, 2025
Due Date
Jan 8, 2026
Release: Nov 13, 2025
Close: Jan 8, 2026
Work includes construction of a new pumping station, including a new wet well, raw sewage pumps, pump controls, and all other appurtenances, as well as the installation of a valve and metering vault, emergency generator, and telemetry equipment. Project also includes the selective demolition of existing pump station equipment. Also included is the replacement of approx 1,500 LF of force main with new 4" pipe.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →