City of Raleigh
The Project consists generally of the following major items: Replacement of five pump station backup generators and other improvement.
00100 Advertisement for Bids
City of Woodstock
Replacing and installing four (4) fixed generators at critical facilities in the community and upgrading the generator at the City Annex. This includes but is not limited to upgrading the 30 kW generator at the City Annex to a 175-kW fixed to include an automatic transfer switch and concrete pad, replacing two (2) pump stations at Brookshire (50 kW, 100 kW), and two (2) pump stations at Bell Park (75kW).
City of Newport News
Pump station pump replacement
City of Durango
Generally consist of furnishing and installing a factory-built booster pump station, salvage of the existing factory pump station for future city use, furnishing and installing a backup generator, installing new pipelines with connections to the pump station and the existing waterlines, installation of two (2) gate valves, abandonment of the existing pipelines, installation of security fencing, extending and installing communication and electrical conduits, installing an electrical panel array, and restoring existing surface conditions. The pump station can only be shut down for a maximum of 5 hours during the switch from the existing pump station to the new pump station
Release
Oct 17, 2025
Close
Dec 04, 2025