CityNY
Posted
Sep 1, 2026
Sep 24, 2026
Water District No. 5 Contract 3 - Broadway Water Main Contract 5 - West Side Water Main
Work includes 1,500 CY rock excavation & removal; 1,500 CY select granular fill; 6,000 LF furnish & install 8-inch diameter dr-18 pvc water main; 21,000 LF furnish & install 12" diameter dr-18 pvc water main; 200 LF directional drilling with 8" diameter dr-11 hdpe water main; 2,500 LF directional drilling with 12" diameter dr-11 hdpe water main; 300 LF directional drilling with 12" diameter dr-11 hdpe carrier pipe & 24" diameter dr-11 hdpe casing pipe. See outside link.