Water System Improvements-Reservoir C West Water Main Replacement RFP
Posted
Sep 16, 2026
Oct 8, 2026
Project consists of but not limited to approx. 14510 LF Clearing and Grubbing; 46980 6" DR18 C900 PVC Water Main; 3050 4" DR18 C900 PVC Water Main; 7150 LF 6" DR18 C900 RJPVC or 8" DR9 IPS HDPE Water Main installed by HDD for Wetland/Steep Area crossing; 155 LF 6" DR18 RJPVC 8" DR9 IPS HDPE Water Main installed by Open Cut Methods; 2973 LF 6" Type II or IV Road Crossing; see bid schedule (p27) for more details.