CityMD
Posted
Aug 18, 2026
Sep 16, 2026
Urgent Need Water Infrastructure Rehabilitation and Improvements Phase II-FY27
Project includes water main repairs and replacement as necessary, including, but not limited to, replacement/installation of various size new ductile iron pipe, valves, fittings, and appurtenances, renew and replacement of existing water services, large and small (residential) meter settings and meter vaults, replacement/installation of fire hydrants, sidewalk restoration, curb and gutter, roadway paving, sedimentation and erosion control measures and maintenance of traffic, as required.