Posted
Oct 27, 2026
Dec 3, 2026
Design-Bid-Build - Rough River Lake Axtel Wastewater Treatment Plant (WWTP)
The U.S. Army Corps of Engineers, Louisville District seeks a contractor to demolish the existing wastewater treatment facility and construct a new plant at Rough River Lake. The estimated performance period is 400 calendar days from the Contract Notice to Proceed. Solicitation W912QR27BA003 will result in one firm-fixed-price contract awarded on the basis of lowest evaluated price.
