CityND
Posted
Aug 11, 2026
Nov 3, 2026
Wastewater Treatment Plant Polymer RFP
Seeking cost proposals for dewatering polymer.
Description: Includes the following work: temporarily moving non regulated fill; treating, testing, and discharging supernatant; treating, testing, and disposing of sludge; and re-moving non regulated fill.
City · IN, US
From the first pre-RFP signals to the published RFP and its files.
Board meeting
533 days before RFP
The engineer proposed evaluating the existing bidder, rebidding the lagoon project, or revising it to a risk-based closure.
Um so basically uh in terms of going forward I think the three options are you with the existing contractor you value engineer uh the project down to a certain amount usually you don't do that because the project scope and cost is significant doesn't allow you to do that under statute in this case because you only had one bidder interested sometimes you…
Roanoke Town Council Meeting Minutes
Board meeting · May 6, 2025
questions all right well then We are going to go ahead and just take the bids under adisement and then we'll schedule another meeting.
Roanoke Town Council Meeting Minutes
Board meeting · May 6, 2025
But the ban isn't enough currently to cover even the lagoon project which they would like to have that done by the end of the year that currently that's the time frame.
Roanoke Town Council Meeting Minutes
Board meeting · May 6, 2025
RFP published
RFP documents aren’t available here yet.
Our team can help you find the original solicitation documents.
Request File RetrievalProposals due (16 days left)
Decision makers connected to this RFP from Town of Roanoke.
Adjacent opportunities open for bidding right now.
CityND
Posted
Aug 11, 2026
Nov 3, 2026
Seeking cost proposals for dewatering polymer.
CityWA
Posted
-
Dec 9, 2026
Construct a new wastewater treatment plant adjacent to the existing wastewater treatment plant utilizing a packaged treatment system with new structural concrete basins, a new headworks screen and channel, a new wastewater lift station, a new Laboratory/Operations building with UV disinfection channels, new concrete formed biosolids dewatering beds, a new outfall pipe and all associated appurtenances and requirements for a fully functional wastewater treatment plant.
CityTX
Posted
Oct 25, 2026
Nov 19, 2026
Seeking qualified vendors for wastewater treatment plant phase 2 - collection system rehabilitation.
CityKY
Posted
Oct 9, 2026
Nov 12, 2026
The project will include the following described construction: Furnishing and installation for the construction of the additions and modifications to the Adairville Wastewater Treatment Plant including new headworks and influent pumps, proposed aeration basin, electrical control building, blowers, piping modifications, new return activated sludge pump station, modifications to the existing aeration tanks / clarifiers, modifications to existing waste activated sludge pumps, new sludge dewatering facility, additional generator, post aeration, demolishing of existing structures, piping, equipment, plumbing, heating, ventilation, electrical, grading, and appurtenances as required for the modifications and improvements to the existing treatment plant and all other work as shown on the Construction Drawings or indicated in the Contract Specifications.