Rough River LakeAxtel Wastewater Treatment Plant Replacement
Posted
Sep 10, 2026
Sep 25, 2026
The U.S. Army Corps of Engineers, Louisville District, is soliciting bids for a firm-fixed-price contract to replace the wastewater treatment plant at Rough River Lake’s Axtel Campground in Breckinridge County, Kentucky. The work includes demolition of the existing facility and construction of a subsurface wastewater treatment and dispersal system with septic tanks, lift stations, an aerobic treatment unit, piping, electrical and control systems, grading, erosion control, and fencing. The active Invitation for Bids has a response deadline of September 25, 2026, at 8:00 AM EDT and includes an optional unit-priced rock-excavation line item.