Discover opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Project includes a new 130' long by 64' wide by 18' deep 1-million-gallon flow equalization basin, which will provide a total storage capacity of 3 million gallons. Other improvements involve enhancing cleaning operations with the use of tipping buckets, replacing the existing mixing system and adding a mixing system to the new EQ tank, replacing the EQ pump station pumps and drain pumps, and updating the overflow totalizing flow meter, instrumentation and level control for operations.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
No files attached to this RFP.
Many agencies add documentation later or require FOIA requests. Starbridge can automatically retrieve these files for you.
Work includes waste water treatment plant improvements.
Posted Date
Nov 24, 2025
Due Date
Jan 27, 2026
Release: Nov 24, 2025
Close: Jan 27, 2026
Work includes waste water treatment plant improvements.
AvailableConstruction of a new centralized wastewater treatment plant including new headworks, grit removal, process building, secondary treatment process and associated concrete basins, aeration system, blowers, onsite lift stations, tertiary filtration for metals removal, UV disinfection system, dewatering equipment, chemical feed equipment, silo, and all necessary ancillary piping, electrical, controls, earthwork, and biosolids removal and disposal. Also included is a new lift station at the Henderson WWTP and force main from the Henderson to Veteran's WWTP site for consolidation of all wastewater treatment at the Veteran’s site. Also included are several collection system improvement components throughout the city's collection system. Finally, an office and laboratory building is included.
Posted Date
Dec 5, 2025
Due Date
Feb 19, 2026
Release: Dec 5, 2025
Close: Feb 19, 2026
Construction of a new centralized wastewater treatment plant including new headworks, grit removal, process building, secondary treatment process and associated concrete basins, aeration system, blowers, onsite lift stations, tertiary filtration for metals removal, UV disinfection system, dewatering equipment, chemical feed equipment, silo, and all necessary ancillary piping, electrical, controls, earthwork, and biosolids removal and disposal. Also included is a new lift station at the Henderson WWTP and force main from the Henderson to Veteran's WWTP site for consolidation of all wastewater treatment at the Veteran’s site. Also included are several collection system improvement components throughout the city's collection system. Finally, an office and laboratory building is included.
AvailableThe project includes a new wastewater treatment plant consisting of: influent splitter structure, raw sewage lift station; headworks building with screening, grit, and odor control equipment; two (2) basin sbr treatment system with blowers, mixers, and decanters; uv disinfection system; low-profile cascade aeration system; outfall line; non-potable water system; sludge processing system including aerobic digester, blowers, mixers, decanter, sludge pumps, centrifuge dewatering, polymer feed, and conveyor system; chemical feed system for phosphorus removal; electrical building; emergency generator mandatory alternate lab and office building; mandatory alternate maintenance building.
Posted Date
Dec 5, 2025
Due Date
Feb 13, 2026
Release: Dec 5, 2025
Close: Feb 13, 2026
The project includes a new wastewater treatment plant consisting of: influent splitter structure, raw sewage lift station; headworks building with screening, grit, and odor control equipment; two (2) basin sbr treatment system with blowers, mixers, and decanters; uv disinfection system; low-profile cascade aeration system; outfall line; non-potable water system; sludge processing system including aerobic digester, blowers, mixers, decanter, sludge pumps, centrifuge dewatering, polymer feed, and conveyor system; chemical feed system for phosphorus removal; electrical building; emergency generator mandatory alternate lab and office building; mandatory alternate maintenance building.
This RFP is for the procurement of sewer system improvements, specifically for the construction of a New Wastewater Treatment Plant.
Posted Date
-
Due Date
Jan 23, 2026
Close: Jan 23, 2026
This RFP is for the procurement of sewer system improvements, specifically for the construction of a New Wastewater Treatment Plant.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis