Summary
The project includes a new wastewater treatment plant consisting of: influent splitter structure, raw sewage lift station; headworks building with screening, grit, and odor control equipment; two (2) basin sbr treatment system with blowers, mixers, and decanters; uv disinfection system; low-profile cascade aeration system; outfall line; non-potable water system; sludge processing system including aerobic digester, blowers, mixers, decanter, sludge pumps, centrifuge dewatering, polymer feed, and conveyor system; chemical feed system for phosphorus removal; electrical building; emergency generator mandatory alternate lab and office building; mandatory alternate maintenance building.