Wastewater Treatment Plant Driveway Improvements RFP
Project involves asphalt milling, installation of asphalt paving, and appurtenant work at 5 different sites within Township.
Description: Planned improvements shall include preliminary treatment building upgrades (mechanical screen replacement, grit equipment replacement, and HVAC improvements), primary clarifiers replacement, new primary sludge pumping station, new intermediate lift station, aeration tank rehabilitation and process improvements (conversion to three-stage), aeration blower replacement in a new secondary control building, replacement of existing final clarifier 1-4 mechanisms and structural rehabilitation and handrail replacement, new final clarifier construction, ras pump station replacement in a new secondary control building, rehab of one anaerobic digester for conversion to sludge storage, plant wide odor control to address odors from the headworks, primary clarifiers, intermediate lift station, and solids dewatering areas, new plantwide standby emergency power generator(s), new WWTP main switchgear replacement, new WWTP SCADA system upgrades, code related improvements for NFPA 820 and other safety related standards, demolition of unused WWTP structures and buildings (north primary clarifiers and associated pump houses, south primary clarifiers and associated pump houses, south headworks building and grit detritor system, gas conditioning building, pipe valve vault building, garage #1, garage #2, and storage building adjacent to the chlorine contact tanks) and related HVAC, plumbing, electrical, instrumentation, and site/civil improvements.
City · IA, US
Original attachments and procurement documents tied to this bid.
No files attached to this RFP.
Many agencies add documentation later or require FOIA requests. Starbridge can automatically retrieve these files for you.
Request File RetrievalAdjacent opportunities open for bidding right now.
CityPA
Posted
Sep 10, 2026
Sep 30, 2026
Project involves asphalt milling, installation of asphalt paving, and appurtenant work at 5 different sites within Township.
CityOR
Posted
Aug 19, 2026
Oct 7, 2026
Procurement of professional engineering design services for the City of Sandy's Wastewater Treatment Plant Improvements, including the retrofit to a membrane bioreactor (MBR) facility and upgrades to headworks, aeration basins, and solids handling processes.
CityTN
Posted
Aug 25, 2026
Sep 24, 2026
The Project consists of the following major elements: new influent equalization basin and associated piping, new equalization feed pump, return pump and associated force mains, and new UV Treatment equipment at the Greenbrier Wastewater Treatment Plant, including electrical work and modifications for a complete project.
CitySD
Posted
Sep 10, 2026
Sep 24, 2026
Work includes approx. of 170 LF of furnish and install 8" PVC pipe; 7,220 LF of furnish and install security fence; 1,410 TON of furnish and install gravel surfacing; 70 LF of furnish and install 18" RCP pipe; 26,522 LB of dust control chloride; 2,000 LF of furnish and install 12" erosion control wattle; 63,000 CY of unclassified excavation; 13,050 CY of install clay liner material; 3,904 TON of furnish and install class b riprap; 7,800 SY of furnish and install fabric filter.