OtherWI
Posted
Nov 4, 2026
Dec 8, 2026
Washington Park Bowl LS Upgrades RFP
Building rehabilitation, electrical & controls replacement, stormwater pump and piping removal and replacement.
Description: Building rehabilitation, electrical & controls replacement, stormwater pump and piping removal and replacement.
City · WI, US
Adjacent opportunities open for bidding right now.
OtherWI
Posted
Nov 4, 2026
Dec 8, 2026
Building rehabilitation, electrical & controls replacement, stormwater pump and piping removal and replacement.
CityAZ
Posted
Oct 21, 2026
Nov 30, 2026
Work includes remove existing restroom fixtures, accessories, and finishes as required; remove and dispose of demolition materials; protect surrounding park facilities and public areas; remove and replace existing plumbing fixtures; install new commercial-grade stainless steel fixtures;replace faucets, valves, flush valves, and associated components; repair plumbing deficiencies discovered during construction (with city approval); replace existing lighting with led fixtures; replace switches, sensors, and electrical components as required; ensure all electrical work meets current code requirements. See attached file.
CityNY
Posted
Nov 3, 2026
Dec 9, 2026
The Village is soliciting work to upgrade the Water Treatment Plant clearwells, including installation of baffles in two clear wells and crack repairs. The work also includes control modifications, with replacement of filter backwash pumps listed as a bid alternate. The posting gives a non-mandatory pre-bid meeting on November 10, 2026, at the treatment plant.
CityAB
Posted
-
Dec 10, 2026
The City of Leduc Alexandra Park Outdoor Pool - Mechanical Upgrades project consists of upgrades to the mechanical pool filters, pumps and accessories, pool heating plant and minor plumbing upgrades. The work is to be completed by April 30, 2027. The scope of work includes the selective demolition and removal of existing pool filtration equipment, including sand filters, associated piping, valves, fittings, and appurtenances. Additional demolition activities include the removal of the existing natural-draft pool heating boiler, gas-fired domestic hot water heater, and modifications to the existing pool chemical treatment and distribution systems. The proposed upgrades include the installation of a new redundant pool heating plant, domestic hot water storage tanks, and pool filtration and circulation equipment, including new filters, pumps, and associated piping systems. New equipment will be provided with dedicated local control systems, integrated with the City of Leduc's existing Building Management System (BMS) to facilitate centralized monitoring, control, and system operation. Additional modifications include relocating the existing pool water testing station to the smaller storage room and transferring the existing pH chemical feed system to the designated Chemical Storage Room. A new emergency safety shower will also be installed within the storage area, together with associated plumbing fixtures, drainage provisions, and necessary piping modifications. The project will also incorporate improvements to the accessibility and operability of existing valves throughout the facility. These modifications include retrofitting selected lever-operated butterfly valves and ball valves with extended operating handles, extension stems, and/or chain-wheel operators, where applicable, to provide improved access and safer operation of valves located in elevated or otherwise difficult-to-reach areas. Associated electrical work will include the modifications and upgrades necessary to accommodate the new mechanical equipment, control systems, and related infrastructure, including electrical power distribution, equipment connections, and integration with the existing building systems.
Decision makers connected to this RFP from City of Racine.
Solicitation files and supporting documents for this bid.