School DistrictCA
Posted
Aug 24, 2026
Oct 1, 2026
Hodge Elementary Parking Lot Expansion (Request for Proposal)
Seeking proposals for improving the parking lot.
Description: The work to be performed, is to include complete demolition and removal of the existing two-story VSS Building. This includes the building structure, foundations, slabs, utilities, and related site improvements within the demolition limits in its entirety. After demolition, the site shall be cleared, rough graded/ over-excavated, and prepared for a new surface parking lot extension to VSS Parking Lot 23. Work includes paving, striping, curbs & gutters, accessible parking and pathways, drainage, lighting, site flatwork, and landscaping. The Contractor shall protect existing ADA improvements from the recent campus-wide ADA Path of Travel Projects, Phases 1 and 2, and repair any damage caused by construction
HigherEducation · CA, US
Original attachments and procurement documents tied to this bid.
No files attached to this RFP.
Many agencies add documentation later or require FOIA requests. Starbridge can automatically retrieve these files for you.
Request File RetrievalAdjacent opportunities open for bidding right now.
School DistrictCA
Posted
Aug 24, 2026
Oct 1, 2026
Seeking proposals for improving the parking lot.
Posted
Sep 13, 2026
Sep 29, 2026
Project includes 2,256 SYD of 1.5" Cold Milling Bituminous Surface; 2,266 SYD of 8" Aggregate Base; 168 FT of 4" yellow Pavement Marking Hatch; 355 SYD Remove Pavement.
Special DistrictTN
Posted
Aug 27, 2026
Sep 24, 2026
Resealing and parking lot expansion. Demolition of limited areas, construction and expansion of new parking areas, parking re-sealing and striping.
CityCA
Posted
Dec 15, 2025
Aug 26, 2031
Administrative hearing officers that will be utilized, as needed, to contract with the city to conduct parking citation administrative hearings on an as-needed, rotational basis.
Decision makers connected to this RFP from Chaffey College.