48" Storm Culvert Addition & New Box Culvert (SR 303 to existing box culvert at Rosewood Grill) RFP
Posted
-
Nov 17, 2026
The proposed work consists of the removal and replacement of an existing box culvert with a 4’x6’ precast concrete box culvert, the installation of 230 LF of 48 hdpp storm pipe parallel to an existing 48" concrete pipe between the commercial parking lot of #36 and #46 e. Streetsboro street, the replacement/relocation of an existing 12 cast iron water main underneath the new 4’x6’ box culvert, existing storm tie-ins into the new storm system, and roadway and parking lot restoration.

