Discover opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Work includes equipping a new well, and installing 145 LF of water main, tying into the existing well house. Modifying existing and installing new process piping in the well house and coordination with the village's control integrator. See outside link.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
No files attached to this RFP.
Many agencies add documentation later or require FOIA requests. Starbridge can automatically retrieve these files for you.
The work shall consist of the drilling of Test Well No. 8, including well performance testing, furnishing, installing and operating the test pump, furnishing, installing, welding and grouting of well casing, temporary piping and electrical, and all other appurtenances, material, labor, supervision, equipment and miscellaneous parts and fittings as necessary and required. Test Well No. 8 consists of a drilling of an initial pilot borehole to a depth of about 175 feet for the purpose of soil sample collection and grain size analysis. Grain size analyses will be required for a minimum of two (2) sample sets within the target aquifer located anywhere between 160 feet and 175 feet. Construction of one (1) 8-IN dia. well in glacial drift at an assumed depth of 175 feet. The construction will consist of approx. 160 feet of 8-IN steel casing with 15 feet of 8-IN SSWW filter packed well screen.
Posted Date
Jan 20, 2026
Due Date
Feb 17, 2026
Release: Jan 20, 2026
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Close: Feb 17, 2026
The work shall consist of the drilling of Test Well No. 8, including well performance testing, furnishing, installing and operating the test pump, furnishing, installing, welding and grouting of well casing, temporary piping and electrical, and all other appurtenances, material, labor, supervision, equipment and miscellaneous parts and fittings as necessary and required. Test Well No. 8 consists of a drilling of an initial pilot borehole to a depth of about 175 feet for the purpose of soil sample collection and grain size analysis. Grain size analyses will be required for a minimum of two (2) sample sets within the target aquifer located anywhere between 160 feet and 175 feet. Construction of one (1) 8-IN dia. well in glacial drift at an assumed depth of 175 feet. The construction will consist of approx. 160 feet of 8-IN steel casing with 15 feet of 8-IN SSWW filter packed well screen.
AvailableInspect and rehabilitate approx three (3) groundwater production wells and investigate/test pump one (1) groundwater production well. Work includes remove, inspect, and service motors and pumps, rehabilitate each well, equip each well with a pump and all other necessary equipment for flow testing (unless otherwise noted), maintain flow equipment during testing, and replace existing pump columns, if necessary. This work will also include flow testing two unequipped production wells.
Posted Date
-
Due Date
Jan 27, 2026
Release: -
Close: Jan 27, 2026
Inspect and rehabilitate approx three (3) groundwater production wells and investigate/test pump one (1) groundwater production well. Work includes remove, inspect, and service motors and pumps, rehabilitate each well, equip each well with a pump and all other necessary equipment for flow testing (unless otherwise noted), maintain flow equipment during testing, and replace existing pump columns, if necessary. This work will also include flow testing two unequipped production wells.
AvailableThe work includes; construction of two (2) 5" dia test-observation wells, construction and aquifer testing of a type i community water supply well known as test-production well no. 8.
Posted Date
Jan 14, 2026
Due Date
Feb 13, 2026
Release: Jan 14, 2026
Close: Feb 13, 2026
The work includes; construction of two (2) 5" dia test-observation wells, construction and aquifer testing of a type i community water supply well known as test-production well no. 8.
AvailableRFP for Ground Water Production Well SM-14 drilling services.
Posted Date
Nov 25, 2025
Due Date
Dec 31, 2099
Release: Nov 25, 2025
Close: Dec 31, 2099
RFP for Ground Water Production Well SM-14 drilling services.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →