CountyFL
Jul 8, 2026
Closes
Aug 14, 2026
Design Services for Veterans Memorial Blvd. Phase II
Provide design and preparation of a complete set of construction contract documents and incidental engineering services, as necessary, for improvements to the transportation facility described herein. Major work mix includes: widen & resurface existing lanes; sidewalk; traffic engineering study; traffic signals; signing/pavement markings; lighting; miscellaneous structures and minor bridge design; traffic engineering studies; signing, pavement marking & channelization; design, right of way, and construction surveying; photogrammetric mapping. See outside link.