Discover opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Demolition of existing high service pumping equipment, piping and structures located in three separate buildings on the site. Construction of a new 48 MGD firm capacity high service pump station and associated yard piping improvements.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
No files attached to this RFP.
Many agencies add documentation later or require FOIA requests. Starbridge can automatically retrieve these files for you.
Replace the existing high service pump and backwash pump at our water treatment plant.
Posted Date
Jan 20, 2026
Due Date
Feb 3, 2026
Release: Jan 20, 2026
Close: Feb 3, 2026
Replace the existing high service pump and backwash pump at our water treatment plant.
AvailablePremium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
DESIGN BUILD the new WTP Demolition and New Clearwells and High Service Pump Station, which includes the demolition of the existing old filter plant, a new high service pump station, and the addition of two new 10 million gallons of Clearwell water storage with space for an additional 20 million gallons in the future.
Posted Date
Oct 31, 2025
Due Date
Feb 13, 2026
Release: Oct 31, 2025
Close: Feb 13, 2026
DESIGN BUILD the new WTP Demolition and New Clearwells and High Service Pump Station, which includes the demolition of the existing old filter plant, a new high service pump station, and the addition of two new 10 million gallons of Clearwell water storage with space for an additional 20 million gallons in the future.
AvailableWork includes installation of a new recessed wet well mounted pump station within a new below grade concrete and wood framed constructed building structure at the wastewater treatment plant includes site work, demolition work, removal and relocation of existing garage structure, earthwork, ledge removal, backfill and compaction, cast-in-place concrete structures, wood framed building, main pump station equipment and controls, drain pump station equipment and controls, all associated process piping and supports, approximately 360 LF of 10" DI force main piping, 1" cts pe process water piping and underground fiber option cable in a common trench; loam and seed, erosion control, temporary pumping, test pits, metals, electrical, scada system modifications, heating and ventilation, and all incidentals for the complete installation of a new main pump station
Posted Date
Jan 14, 2026
Due Date
Feb 12, 2026
Release: Jan 14, 2026
Close: Feb 12, 2026
Work includes installation of a new recessed wet well mounted pump station within a new below grade concrete and wood framed constructed building structure at the wastewater treatment plant includes site work, demolition work, removal and relocation of existing garage structure, earthwork, ledge removal, backfill and compaction, cast-in-place concrete structures, wood framed building, main pump station equipment and controls, drain pump station equipment and controls, all associated process piping and supports, approximately 360 LF of 10" DI force main piping, 1" cts pe process water piping and underground fiber option cable in a common trench; loam and seed, erosion control, temporary pumping, test pits, metals, electrical, scada system modifications, heating and ventilation, and all incidentals for the complete installation of a new main pump station
AvailableConstruction of a new 12 gpm High Service Pump Station and Building.
Posted Date
Jan 22, 2026
Due Date
Feb 12, 2026
Release: Jan 22, 2026
Close: Feb 12, 2026
Construction of a new 12 gpm High Service Pump Station and Building.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →