Discover Opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
The State of Tennessee invites bids for the repair of the UTK 11th Street Pedestrian Bridge. General contractors must be licensed and qualified per state law, with a 5% bid security required. Bidding documents are available from specified sources, and a non-discrimination policy applies.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Work consists of the repair of multiple pedestrian bridges, including but not limited to spot repairs, concrete patching, deck / railing replacement, and sealing of bridge.
Posted Date
Nov 20, 2025
Due Date
Dec 18, 2025
Release: Nov 20, 2025
Close: Dec 18, 2025
Work consists of the repair of multiple pedestrian bridges, including but not limited to spot repairs, concrete patching, deck / railing replacement, and sealing of bridge.
AvailablePedestrian bridge repairs.
Posted Date
Oct 14, 2025
Due Date
Dec 12, 2025
Release: Oct 14, 2025
Close: Dec 12, 2025
Pedestrian bridge repairs.
Work includes construction of a pre-fabricated pedestrian bridge spanning 180' over the mahoning river, including abutment and pier construction, setting of the bridge, a trail connection to market street, an ada ramp structure on the perkins park side of the river, and decorative bridge lighting. The pre-fabricated bridge will be manufactured by others, with the procurement of the bridge and coordination of the installation being the responsibility of the general contractor.
Posted Date
Nov 14, 2025
Due Date
Dec 12, 2025
Release: Nov 14, 2025
Close: Dec 12, 2025
Work includes construction of a pre-fabricated pedestrian bridge spanning 180' over the mahoning river, including abutment and pier construction, setting of the bridge, a trail connection to market street, an ada ramp structure on the perkins park side of the river, and decorative bridge lighting. The pre-fabricated bridge will be manufactured by others, with the procurement of the bridge and coordination of the installation being the responsibility of the general contractor.
The project consists of the removal of the existing pedestrian bridge and construction of a replacement pedestrian bridge.
Posted Date
Oct 1, 2025
Due Date
Dec 12, 2025
Release: Oct 1, 2025
Close: Dec 12, 2025
The project consists of the removal of the existing pedestrian bridge and construction of a replacement pedestrian bridge.
Surface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →Premium
Get complete source documentation & analysis