Discover opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
This RFP is for the structural rehabilitation and repair of the Windsor Channel Pedestrian Bridge, including concrete repairs, steel component restoration, surface preparation and coatings, and replacement of worn elements.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Rehabilitation and repair services for Governors Island Pedestrian Bridge and Fender Wharf, including structural repairs, demolition of boat docks, and installation of fixtures.
Posted Date
Dec 23, 2025
Due Date
Feb 5, 2026
Release: Dec 23, 2025
Close: Feb 5, 2026
Rehabilitation and repair services for Governors Island Pedestrian Bridge and Fender Wharf, including structural repairs, demolition of boat docks, and installation of fixtures.
AvailableProject includes the removal of the existing pedestrian bridge and parts of the existing concrete abutments to construct new concrete abutments and place a new steel pedestrian bridge. The scope of work includes, excavation, demolition, concrete work, stone placement and structure placement.
Posted Date
Jan 22, 2026
Due Date
Feb 26, 2026
Release: Jan 22, 2026
Close: Feb 26, 2026
Project includes the removal of the existing pedestrian bridge and parts of the existing concrete abutments to construct new concrete abutments and place a new steel pedestrian bridge. The scope of work includes, excavation, demolition, concrete work, stone placement and structure placement.
AvailablePedestrian bridge construction. This project consists of the construction of a pre-fabricated steel pedestrian bridge approx 260' length at the end of the existing boardwalk in Johnson Park. Construction includes clearing & grubbing, grading, erosion control, drainage, plazas, concrete and paver sidewalk, boardwalk, gateway structures and other items of work.
Posted Date
-
Due Date
Jan 28, 2026
Close: Jan 28, 2026
Pedestrian bridge construction. This project consists of the construction of a pre-fabricated steel pedestrian bridge approx 260' length at the end of the existing boardwalk in Johnson Park. Construction includes clearing & grubbing, grading, erosion control, drainage, plazas, concrete and paver sidewalk, boardwalk, gateway structures and other items of work.
AvailablePerform dismantling, removal, and disposal of the existing pedestrian bridge superstructure and designing, fabricating, furnishing and installing a replacement prefabricated pedestrian bridge superstructure attached to the existing bridge abutments with reconstructed anchor bolts. The replacement prefabricated pedestrian bridge superstructure shall resemble the attached original bridge plans in terms of make, general appearance and aesthetic appeal.
Posted Date
Jan 6, 2026
Due Date
Jan 29, 2026
Release: Jan 6, 2026
Close: Jan 29, 2026
Perform dismantling, removal, and disposal of the existing pedestrian bridge superstructure and designing, fabricating, furnishing and installing a replacement prefabricated pedestrian bridge superstructure attached to the existing bridge abutments with reconstructed anchor bolts. The replacement prefabricated pedestrian bridge superstructure shall resemble the attached original bridge plans in terms of make, general appearance and aesthetic appeal.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis