Discover opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Sealed bids are solicited by Bridgeland Development, LP on behalf of Harris County Water Control & Improvement District No. 159 for construction of the Upper Langham Creek Phase 3 Channel and Detention Design, Contract 2, including extensive earthwork and reinforced concrete box/pipe installations. Bids are due 2:00 p.m. local time on February 11, 2026 and will be opened publicly in the BGE, Inc. office and via Microsoft Teams; a non-mandatory pre-bid Microsoft Teams conference is scheduled for February 4, 2026 at 2:00 p.m. Plans and bid documents are available via the civcast site (search ID 15985-00).
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
No files attached to this RFP.
Many agencies add documentation later or require FOIA requests. Starbridge can automatically retrieve these files for you.
Work includes : approx 850,000 CY of excavation with on-site disposal (including light clearing and grubbing, demucking, site preparation, hauling excavation, compaction of material, and clay liner installation); approx 460 LF of 72" reinforced concrete pipe; 55 LF of 4' x 4' reinforced concrete boxes (rcb); 110 LF of 5' x 4' rcb; 335 LF of 6' x 4' rcb; 360 LF of 6' x 6' rcb; 450 LF of 10' x 10' rcb; and all appurtenances.
Posted Date
Jan 15, 2026
Due Date
Feb 4, 2026
Release: Jan 15, 2026
Close: Feb 4, 2026
Work includes : approx 850,000 CY of excavation with on-site disposal (including light clearing and grubbing, demucking, site preparation, hauling excavation, compaction of material, and clay liner installation); approx 460 LF of 72" reinforced concrete pipe; 55 LF of 4' x 4' reinforced concrete boxes (rcb); 110 LF of 5' x 4' rcb; 335 LF of 6' x 4' rcb; 360 LF of 6' x 6' rcb; 450 LF of 10' x 10' rcb; and all appurtenances.
AvailableThe Project consists of Contract #1-constructing three pickleball courts with stone base, 2 1/2" of 19mm, 1 1/2” of 9.5FG, ADA walkway, fencing, painting court, and installation of nets; Contract #2-installing a metal roof on Pavilion C and soffit/facia on all three pavilions; and Contract #3-installing and connecting solar panels on the 3 pavilions at Park.
Posted Date
-
Due Date
Feb 3, 2026
Close: Feb 3, 2026
The Project consists of Contract #1-constructing three pickleball courts with stone base, 2 1/2" of 19mm, 1 1/2” of 9.5FG, ADA walkway, fencing, painting court, and installation of nets; Contract #2-installing a metal roof on Pavilion C and soffit/facia on all three pavilions; and Contract #3-installing and connecting solar panels on the 3 pavilions at Park.
AvailableDesign-build services for Phase 1 capital improvements at International Charter School of Atlanta's Upper Campus, including entrance and student drop-off canopies, sidewalks, landscaping, and parking lot repaving.
Posted Date
Jan 7, 2026
Due Date
Feb 4, 2026
Release: Jan 7, 2026
Close: Feb 4, 2026
Design-build services for Phase 1 capital improvements at International Charter School of Atlanta's Upper Campus, including entrance and student drop-off canopies, sidewalks, landscaping, and parking lot repaving.
AvailableWork includes 10 CY extra excavation (hand labor); 100 CY extra excavation (machine); 10 CY extra concrete (class a); 10 CY extra concrete (class b); 10 ton extra cement stabilized sand (bedding or backfill) for water lines; 2 sacks/ton; 10 ton extra cement stabilized sand (bedding or backfill) for storm sewer; 1-1/2 sacks/ton; 100 CY crushed stone in trench bottom for pipe bedding in wet sand areas, including compaction, complete in place; 500 CY cement stabilized crushed stone for pipe bedding in wet sand areas, including compaction, complete in place; 100 CY cement stabilized sand for pipe bedding in wet sand areas, including compaction, complete in place; 2,500 LF deep wells for dewatering, complete in place. See attached file.
Posted Date
Dec 18, 2025
Due Date
Jan 28, 2026
Release: Dec 18, 2025
Close: Jan 28, 2026
Work includes 10 CY extra excavation (hand labor); 100 CY extra excavation (machine); 10 CY extra concrete (class a); 10 CY extra concrete (class b); 10 ton extra cement stabilized sand (bedding or backfill) for water lines; 2 sacks/ton; 10 ton extra cement stabilized sand (bedding or backfill) for storm sewer; 1-1/2 sacks/ton; 100 CY crushed stone in trench bottom for pipe bedding in wet sand areas, including compaction, complete in place; 500 CY cement stabilized crushed stone for pipe bedding in wet sand areas, including compaction, complete in place; 100 CY cement stabilized sand for pipe bedding in wet sand areas, including compaction, complete in place; 2,500 LF deep wells for dewatering, complete in place. See attached file.
Surface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis