Discover opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Upgrade our existing telephone system to an ADA-compliant alarm and PA system, with improved telephone and inter-office communication features
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
No files attached to this RFP.
Many agencies add documentation later or require FOIA requests. Starbridge can automatically retrieve these files for you.
Work includes fire alarm system upgrade.
Posted Date
Jan 16, 2026
Due Date
Mar 6, 2026
Release: Jan 16, 2026
Close: Mar 6, 2026
Work includes fire alarm system upgrade.
AvailablePremium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
The existing fire alarm at the Architecture and Design Studio (ADS) building is non-compliant. In addition, this fire alarm system is no longer supported by the industry and presents a challenge in finding replacement parts. The project includes replacing the fire alarm system as well as removal of the old system. The existing building fire alarm system to remain in place and operational until the new system is fully installed, commissioned and accepted by the University. All existing architectural finishes impacted by the removal of the existing fire alarm equipment, devices, conduit, wiring, boxes, etc., shall be restored/repaired to match surrounding conditions.
Posted Date
Aug 13, 2025
Due Date
Feb 4, 2026
Release: Aug 13, 2025
Close: Feb 4, 2026
The existing fire alarm at the Architecture and Design Studio (ADS) building is non-compliant. In addition, this fire alarm system is no longer supported by the industry and presents a challenge in finding replacement parts. The project includes replacing the fire alarm system as well as removal of the old system. The existing building fire alarm system to remain in place and operational until the new system is fully installed, commissioned and accepted by the University. All existing architectural finishes impacted by the removal of the existing fire alarm equipment, devices, conduit, wiring, boxes, etc., shall be restored/repaired to match surrounding conditions.
AvailableExisting building's auditorium/gymnasium/interior renovations/fire alarm/electrical system/parapets/exterior masonry.
Posted Date
Jan 15, 2026
Due Date
Feb 10, 2026
Release: Jan 15, 2026
Close: Feb 10, 2026
Existing building's auditorium/gymnasium/interior renovations/fire alarm/electrical system/parapets/exterior masonry.
AvailableIndependent School District of Boise City #1 is soliciting sealed bids for a fire alarm system upgrade at Cynthia Mann Elementary School, including a new non‑proprietary voice evacuation system and related devices. A pre‑bid conference is scheduled onsite on January 19, 2026 at 9:00 AM, and bids are due by 2:30 PM local time on January 27, 2026 at the District Administrative Office. Work is to begin around May 26, 2026 with substantial completion by August 1, 2026, in compliance with NFPA 72 and applicable regulations.
Posted Date
-
Due Date
Jan 27, 2026
Close: Jan 27, 2026
Independent School District of Boise City #1 is soliciting sealed bids for a fire alarm system upgrade at Cynthia Mann Elementary School, including a new non‑proprietary voice evacuation system and related devices. A pre‑bid conference is scheduled onsite on January 19, 2026 at 9:00 AM, and bids are due by 2:30 PM local time on January 27, 2026 at the District Administrative Office. Work is to begin around May 26, 2026 with substantial completion by August 1, 2026, in compliance with NFPA 72 and applicable regulations.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →