Open RFPUPCOMING ..... Alton Driver Relief Facility (rebid)
Description: This notice provides advance public notice of an upcoming bid opportunity. No documents are currently available.
Rebid of prior cancelled project: This federally funded project is located at 600 Piasa St., Alton, IL 62002. Construction includes an 872- square-foot building addition featuring a driver lounge, kitchenette, mechanical/storage room, and circulation space. The addition will be connected to an existing 785-square-foot building containing two restrooms and a mechanical room and will be constructed to match the existing structure with block CMU walls, brick veneer, cast stone banding and sills, glass block windows, and cast stone wall caps, with a slate roof over light-gauge metal trusses. Site improvements will include new parking stalls along a brick retaining wall, modifications to the existing concrete and brick patio, and a new concrete ramp. The scope also includes new access control and video surveillance for the new addition and adjacent bus station structure, requiring modifications to the existing mechanical space, as well as the construction of an outdoor mechanical enclosure to house HVAC equipment.
Estimated IFB release date for construction: November 2026