Lehigh Carbon Community College
Higher EducationPA
Posted
Oct 26, 2026
Dec 11, 2026
Biotechnology Training Facility RFP
Work includes biotechnology training facility.
Description: Renovation of a portion of the first floor of Science Hall to create a new Biotechnology Laboratory and Training Facility, including two teaching laboratories, laboratory support and storage, a biotechnology lecture hall, aseptic fill and automated fill training rooms, offices, and associated support areas. Work includes demolition, new partitions, ceilings and lighting, casework, flooring and finishes, plus HVAC, plumbing and electrical work and exterior patio refurbishment; an alternate bid item covers removal and replacement of existing windows. The contract covers furnishing all labor, materials, tools, supervision and permits necessary to complete the described renovation work.
HigherEducation · PA, US
Adjacent opportunities open for bidding right now.
Lehigh Carbon Community College
Higher EducationPA
Posted
Oct 26, 2026
Dec 11, 2026
Work includes biotechnology training facility.
CityRI
Posted
Nov 18, 2026
Dec 7, 2026
The City of Newport, through its Division of Purchasing on behalf of the Utilities Department’s Water Pollution Control Division, is seeking bids for one fiberglass reinforced polymer (FRP) safety training platform. The platform is to match the WEF Operations Challenge Safety Event Platform. It is to be delivered to the Water Pollution Control Facility at 250 JT Connell Highway in Newport, Rhode Island.
Special DistrictIL
Posted
Sep 24, 2026
Dec 4, 2026
This notice provides advance public notice of an upcoming bid opportunity. No documents are currently available. Rebid of prior cancelled project: This federally funded project is located at 600 Piasa St., Alton, IL 62002. Construction includes an 872- square-foot building addition featuring a driver lounge, kitchenette, mechanical/storage room, and circulation space. The addition will be connected to an existing 785-square-foot building containing two restrooms and a mechanical room and will be constructed to match the existing structure with block CMU walls, brick veneer, cast stone banding and sills, glass block windows, and cast stone wall caps, with a slate roof over light-gauge metal trusses. Site improvements will include new parking stalls along a brick retaining wall, modifications to the existing concrete and brick patio, and a new concrete ramp. The scope also includes new access control and video surveillance for the new addition and adjacent bus station structure, requiring modifications to the existing mechanical space, as well as the construction of an outdoor mechanical enclosure to house HVAC equipment. Estimated IFB release date for construction: November 2026
Ohio Department of Natural Resources
State AgencyOH
Posted
-
Dec 9, 2026
Provide a shelter and storage facility construction project includes alternates for fishing dock, landscaping, and roofing options.
Decision makers connected to this RFP from Lehigh Carbon Community College.
Solicitation files and supporting documents for this bid.