Summary
The University of Nevada, Reno is soliciting bids (ITB 9102 Addendum 1) to remove and replace the speaker and subwoofer system and install a Q-Sys audio control system on the roof of Mackay Stadium; the project is a prevailing wage construction project estimated at $70,000–$170,000 and requires crane operations and required insurance. Bids must be submitted electronically through Nevada’s NGEM/IonWave portal; the solicitation was issued 2026-05-05 and closes 2026-05-21 at 2:00 PM PT. Work is scheduled to begin June 1, 2026 and be complete by July 31, 2026; bid documents and templates are attached on the portal (login required).