Discover Opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
The project includes the rehabilitation of existing sanitary sewer lines through pipe bursting methods, replacement of sanitary sewer service laterals, and rehabilitation of sewer manholes. Work includes, 175 SY of pavement repair (hmac type d) 2" & flowable; 120 LF of trench excavation safety protection; 665 LF of sewer main television inspection (8" - 15"); 665 LF of install 8" dr17 ips hdpe san. Sewer pipe, method pipe bursting; 1,120 LF of sewer main television inspection (8" - 15"); 1,120 LF of install 8" dr17 ips hdpe san. Sewer pipe, method pipe bursting. See attached files.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
The City of Moriarty issued an emergency contract to perform pipe bursting and asphalt restoration to repair a failed sewer line and prevent sewage backups and environmental/health risks. The work includes directional drilling, pipe bursting of an 8" SAS line, CCTV/cleaning, restoring affected services, removing and replacing asphalt patches, and paving the trench.
Posted Date
-
Due Date
Dec 13, 2025
Close: Dec 13, 2025
The City of Moriarty issued an emergency contract to perform pipe bursting and asphalt restoration to repair a failed sewer line and prevent sewage backups and environmental/health risks. The work includes directional drilling, pipe bursting of an 8" SAS line, CCTV/cleaning, restoring affected services, removing and replacing asphalt patches, and paving the trench.
AvailableRemove and replace an existing 8" dia ductile iron discharge pipe, flanges, bolts, and chemical feed quills with the chemical feed room at multiple production well sites.
Posted Date
Dec 1, 2025
Due Date
Jan 5, 2026
Release: Dec 1, 2025
Close: Jan 5, 2026
Remove and replace an existing 8" dia ductile iron discharge pipe, flanges, bolts, and chemical feed quills with the chemical feed room at multiple production well sites.
AvailableONWASA requests bids to remove and replace existing 8-inch ductile iron discharge piping and fittings (AWWA C151/C115, class 350), associated 3" back-pressure/relief valves, flanges/fasteners, and chemical injection quills at three Black Creek well sites (Well #8, #12, #13). Scope includes demolition, below-grade piping replacement, concrete saw-cut and repair, disinfection and bacterial testing, supply/installation of specified retractable injection quills (or approved equal), pressure testing, and site restoration. Key vendor qualifiers: provide all labor, equipment and materials; hold a valid North Carolina Utilities Contractor license; attend mandatory site visits to all sites; submit pricing on the provided bid form; comply with insurance, E-Verify, and warranty requirements.
Posted Date
Dec 1, 2025
Due Date
Jan 5, 2026
Release: Dec 1, 2025
Close: Jan 5, 2026
2025 Trenchless Long Lining Repairs Project. The proposed improvement consists of performing approx 9,600 LF of cured in place pipe long linings to repair damaged and failed sections of 8", 10", 12", 15", 18", 21", 27", 30", and 36" storm & sanitary sewers at various locations throughout the city.
Posted Date
Nov 26, 2025
Due Date
Dec 17, 2025
Release: Nov 26, 2025
Close: Dec 17, 2025
2025 Trenchless Long Lining Repairs Project. The proposed improvement consists of performing approx 9,600 LF of cured in place pipe long linings to repair damaged and failed sections of 8", 10", 12", 15", 18", 21", 27", 30", and 36" storm & sanitary sewers at various locations throughout the city.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
ONWASA requests bids to remove and replace existing 8-inch ductile iron discharge piping and fittings (AWWA C151/C115, class 350), associated 3" back-pressure/relief valves, flanges/fasteners, and chemical injection quills at three Black Creek well sites (Well #8, #12, #13). Scope includes demolition, below-grade piping replacement, concrete saw-cut and repair, disinfection and bacterial testing, supply/installation of specified retractable injection quills (or approved equal), pressure testing, and site restoration. Key vendor qualifiers: provide all labor, equipment and materials; hold a valid North Carolina Utilities Contractor license; attend mandatory site visits to all sites; submit pricing on the provided bid form; comply with insurance, E-Verify, and warranty requirements.