Discover opportunities months before the RFP drops
Learn more →Key metrics and characteristics
Government ID for mapping buyers across datasets.
Full-time equivalent employees.
Population size to gauge opportunity scale.
How easy their procurement process is to navigate.
How likely this buyer is to spend on new technology based on operating budget trends.
How likely this buyer is to adopt new AI technologies.
How often this buyer champions startups and early adoption.
Includes fiscal year calendars, procurement complexity scores, and strategic insights.
Procurement guidance and navigation tips.
Lower scores indicate easier procurement processes. Created by Starbridge.
Sole Source: Deprioritize; consider only if a professional services exemption clearly applies.
Coops: Lead with Sourcewell or OMNIA Partners. If not available, ask about HGACBuy.
Entity: City of Port Arthur, TX.
No publicly documented sole source awards. Professional services are exempt from competitive bidding by ordinance, but this path does not appear commonly used and is high-risk compared to cooperatives. No sole source dollar threshold was provided in the information.
Synthesizing live web signals with exclusive contracts, FOIA docs, and board-level intelligence.
Ask a question to get started or click a suggestion below.
Search across City of Port Arthur's meeting minutes, FOIA documents, procurement records, and public filings. Our AI reads thousands of sources so you don't have to.
Keep your public sector contacts fresh and actionable. No more stale data.
Premium
Win more deals with deep buyer insights
Decision Makers
Director of Parks And Recreation
Director of Finance
City Manager
Capital Improvement Projects Engineer
Premium
Access the largest public sector contact database
Active opportunities open for bidding
City of Port Arthur
Work includes 1 LS excavation & trench safety plan; 1 LS erosion & sedimentation control; 115 SY 6" thick reinforced concrete driveway replacement as required; 1,720 SY seeding for erosion control, complete in place; 2 EA sanitary sewer manhole complete in place; 65 LF 18" DR 11 HDPE sanitary sewer complete including connection to manhole and lift station wet well complete in place; 260 LF 12" ductile iron force main complete in place; 1 LS 1" HDPE water service complete in place including tap, meter with meter box, freeze proof hose bib and 1" rpz with heated aluminum enclosure. See attached file.
Posted Date
Jan 21, 2026
Due Date
Feb 4, 2026
Release: Jan 21, 2026
City of Port Arthur
Close: Feb 4, 2026
Work includes 1 LS excavation & trench safety plan; 1 LS erosion & sedimentation control; 115 SY 6" thick reinforced concrete driveway replacement as required; 1,720 SY seeding for erosion control, complete in place; 2 EA sanitary sewer manhole complete in place; 65 LF 18" DR 11 HDPE sanitary sewer complete including connection to manhole and lift station wet well complete in place; 260 LF 12" ductile iron force main complete in place; 1 LS 1" HDPE water service complete in place including tap, meter with meter box, freeze proof hose bib and 1" rpz with heated aluminum enclosure. See attached file.
AvailableCity of Port Arthur
The project consist of approx 1,860 LF 8" HDPE sanitary sewer pipe via pipe bursting or/and open cut; 285 LF 8" HDPE rehabilitate sanitary sewer pipe via directional boring; 6 EA 4" furnish and install sanitary sewer service line (short side); 2,150 LF pre and post-installation tv inspection; 250 LF refurbish existing sanitary sewer manhole utilizing a liner product that must be approved by the Engineer; 3 EA reinforced concrete sanitary sewer manhole.
Posted Date
Jan 14, 2026
Due Date
Feb 4, 2026
Release: Jan 14, 2026
City of Port Arthur
Close: Feb 4, 2026
The project consist of approx 1,860 LF 8" HDPE sanitary sewer pipe via pipe bursting or/and open cut; 285 LF 8" HDPE rehabilitate sanitary sewer pipe via directional boring; 6 EA 4" furnish and install sanitary sewer service line (short side); 2,150 LF pre and post-installation tv inspection; 250 LF refurbish existing sanitary sewer manhole utilizing a liner product that must be approved by the Engineer; 3 EA reinforced concrete sanitary sewer manhole.
AvailableCity of Port Arthur
Seeking a qualified consulting firm to lead the development of a comprehensive master plan.
Posted Date
Jan 14, 2026
Due Date
Feb 4, 2026
Release: Jan 14, 2026
City of Port Arthur
Close: Feb 4, 2026
Seeking a qualified consulting firm to lead the development of a comprehensive master plan.