Wisconsin Department of Administration
State AgencyWI
Posted
Sep 8, 2026
Oct 15, 2026
Thermal Valve Replacement and Catwalk
In general, the work consists of: thermal valve replacement & catwalk at the heat and power plant.
Description: This Invitation to Bid is for Balance of Plant construction services, including owner-furnished equipment erection, drilled piers, building slab, equipment pads, foundations (dead end, gas yard, pipe support rack), excavation, concrete, testing, backfill work, structural steel, pipe rack steel supports, joists, decking, grating, guardrail, ladder, connections, structural steel connection design, and elevated concrete floor slabs for the Unit 10 Combined Heat and Power Plant.
SpecialDistrict · IA, US
Original attachments and procurement documents tied to this bid.
Decision makers connected to this RFP from Muscatine Power and Water.
Adjacent opportunities open for bidding right now.
Wisconsin Department of Administration
State AgencyWI
Posted
Sep 8, 2026
Oct 15, 2026
In general, the work consists of: thermal valve replacement & catwalk at the heat and power plant.
Posted
Aug 10, 2026
Aug 10, 2027
Developed a solid-state system and process that separates oxygen from ambient air and compresses the resulting purified oxygen – with a significant reduction in power con-sumption compared to prior state-of-the-art. It is based upon a proven solid oxide electrochemical oxygen separation and compression technique that derives purified oxygen from ambient air and compresses it using an electrochemical pumping method. This electrically driven technology relies upon the high operating temperature of electrochemical cell stacks for maximum efficiency. An inverse relationship exists between high temperature and electrical resistance; thus, a heated system requires less energy to drive oxide ions across a cell membrane and compress the resulting purified oxygen. Ambient air that is fed and circulated for processing through the system also helps to stabilize high system operating temperatures. To prevent the ambient air from overcooling the electrochemical process, the incoming air is preheated. However, in existing systems, this pre-heating incurs a large cost penalty in power consumption. The new solid-state system design performs electrochemical reactions to generate purified oxygen but uses an embedded heat exchanger to preheat the incoming air with system waste heat without the need for supplemental heaters, significantly boosting efficiency.
Morongo Band of Mission Indians
Indigenous GovernmentCA
Posted
Sep 9, 2026
Oct 22, 2026
Construction of the MBMI combined heat and power ("CHP) phase 2 project. The work includes, but is not limited to, the following: earthwork & trenching, water improvements, sewer improvements, dry utilities, street and surface improvements, restoration & surface improvements.
Higher EducationNY
Posted
Sep 19, 2026
Oct 9, 2026
Work include construction of a small building. Sitework required to provide utilities to and from the building. Concrete sidewalk to provide pedestrian access abd accessible route to the building. New building with utility closet. Mechanical work for heat and cooling. Electrical work to power and light the building. Plumbing work to provide minimal water and sanitary. Fire alarm work to meet code requirement.