Construct Student Affairs Rehearsal Building RFP
Posted
Sep 19, 2026
Oct 9, 2026
Work include construction of a small building. Sitework required to provide utilities to and from the building. Concrete sidewalk to provide pedestrian access abd accessible route to the building. New building with utility closet. Mechanical work for heat and cooling. Electrical work to power and light the building. Plumbing work to provide minimal water and sanitary. Fire alarm work to meet code requirement.
