CityIA
Posted
Sep 3, 2026
Sep 24, 2026
Union Station Flood Repairs RFP
Work consist of 400 cy of excavation, 1273 sy of subbase, modified, 6", 276 lf of storm sewer, trenched, hdpe, 12", 1 ea of inline rubber check valve, 3 ea of manhole adjustment, 1273 sy of pavement, pcc, 6 inch, 129 sy of removal of sidewalk, 142 sy of pavement removal, 575 lf of brick barrier curb removal, 1111 sy of brick paving removal, 2 ea of traffic signs, 1742 sf of conventional seeding, fertilizing, and mulching, low mow fescue, 3920 sf of conventional seeding, fertilizing, and mulching, 486 lf of silt fence, 486 lf of silt fence, removal of sediment. See outside link.