Posted
Sep 1, 2026
Sep 7, 2026
Uninterrupted Power Supply (UPS) Maintenance CIWT Pensacola, FL RFP
Preventive (Scheduled) Maintenance: The Contractor shall schedule and perform semiannual preventive maintenance (2 times per year) on the UPS to include the following: Visual Inspection: a. Inspect all printed circuit board connections for cleanliness, swab contacts if necessary. b. Inspect all power connections for signs of overheating. c. Inspect all subassemblies, bridges and legs for signs of component defects or stress. d. Inspect all DC capacitors for signs of leakage. e. Inspect all AC capacitors for signs of leakage. See attached file.