Discover opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Replacement of existing fiberglass shower enclosures with solid surface shower walls and pans, complete with all new fixtures, drains, mixing valves and curtains.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Work includes to refinish 73 fibergalss shower pans and surrounds in hunter hall.
Posted Date
Dec 24, 2025
Due Date
Jan 16, 2026
Release: Dec 24, 2025
Close: Jan 16, 2026
Work includes to refinish 73 fibergalss shower pans and surrounds in hunter hall.
AvailableTexas A&M University seeks a contractor to perform interior renovations in Keathley Residence Hall focused on plumbing and bathroom upgrades across multiple vertical stacks. The scope includes replacing vertical sanitary plumbing components, installing new plumbing fixtures and shower systems, and adding a toilet exhaust system, finishes, and accessories. The project modernizes the dorm’s bathroom infrastructure to improve maintenance and functionality.
Posted Date
Dec 22, 2025
Due Date
Feb 6, 2026
Release: Dec 22, 2025
Close: Feb 6, 2026
Texas A&M University seeks a contractor to perform interior renovations in Keathley Residence Hall focused on plumbing and bathroom upgrades across multiple vertical stacks. The scope includes replacing vertical sanitary plumbing components, installing new plumbing fixtures and shower systems, and adding a toilet exhaust system, finishes, and accessories. The project modernizes the dorm’s bathroom infrastructure to improve maintenance and functionality.
AvailableConstruction services for the Underwood Creek Daylighting project, including demolition, new channel excavation, concrete retaining wall construction, culvert and pedestrian bridge installation, storm sewer work, asphalt paving, concrete curb and sidewalk construction, landscaping, and vegetation maintenance.
Posted Date
Jan 6, 2026
Due Date
Jan 27, 2026
Release: Jan 6, 2026
Close: Jan 27, 2026
Construction services for the Underwood Creek Daylighting project, including demolition, new channel excavation, concrete retaining wall construction, culvert and pedestrian bridge installation, storm sewer work, asphalt paving, concrete curb and sidewalk construction, landscaping, and vegetation maintenance.
AvailableDemolition and abandonment of the existing underwood creek channel culvert and stream channel. New channel excavation and construction. Soil disposal. Concrete retaining wall construction. Quarry stone bank armoring. New road crossing culvert construction at wall street. Pedestrian bridge across the newly constructed channel. Storm sewer construction. Asphalt road and parking lot paving. Concrete curb and gutter and sidewalk construction. Landscaping and restoration of areas disturbed during construction. Maintenance of vegetation and plant items.
Posted Date
Jan 6, 2026
Due Date
Jan 27, 2026
Release: Jan 6, 2026
Close: Jan 27, 2026
Demolition and abandonment of the existing underwood creek channel culvert and stream channel. New channel excavation and construction. Soil disposal. Concrete retaining wall construction. Quarry stone bank armoring. New road crossing culvert construction at wall street. Pedestrian bridge across the newly constructed channel. Storm sewer construction. Asphalt road and parking lot paving. Concrete curb and gutter and sidewalk construction. Landscaping and restoration of areas disturbed during construction. Maintenance of vegetation and plant items.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis