Discover opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Demolition and abandonment of the existing underwood creek channel culvert and stream channel. New channel excavation and construction. Soil disposal. Concrete retaining wall construction. Quarry stone bank armoring. New road crossing culvert construction at wall street. Pedestrian bridge across the newly constructed channel. Storm sewer construction. Asphalt road and parking lot paving. Concrete curb and gutter and sidewalk construction. Landscaping and restoration of areas disturbed during construction. Maintenance of vegetation and plant items.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
No files attached to this RFP.
Many agencies add documentation later or require FOIA requests. Starbridge can automatically retrieve these files for you.
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Construction services for the Underwood Creek Daylighting project, including demolition, new channel excavation, concrete retaining wall construction, culvert and pedestrian bridge installation, storm sewer work, asphalt paving, concrete curb and sidewalk construction, landscaping, and vegetation maintenance.
Posted Date
Jan 6, 2026
Due Date
Jan 27, 2026
Release: Jan 6, 2026
Close: Jan 27, 2026
Construction services for the Underwood Creek Daylighting project, including demolition, new channel excavation, concrete retaining wall construction, culvert and pedestrian bridge installation, storm sewer work, asphalt paving, concrete curb and sidewalk construction, landscaping, and vegetation maintenance.
AvailableWork includes demolition of the existing concessions building, footings, and utility vault north of the existing building. Existing utilities serving the concessions building and irrigation will be re-routed to serve the new building. A fire hydrant will be relocated. Construction of a new 2200 SF building to house restrooms, a storage room, and concessions. The building is a wood post-framed structure with metal panel exterior walls. Additional area is covered by a roof overhang on the north and west sides of the building. The building will not be heated or cooled, but exhaust fans will be provided in the restrooms and concessions spaces. See outside link.
Posted Date
-
Due Date
Jan 20, 2026
Release: -
Close: Jan 20, 2026
Work includes demolition of the existing concessions building, footings, and utility vault north of the existing building. Existing utilities serving the concessions building and irrigation will be re-routed to serve the new building. A fire hydrant will be relocated. Construction of a new 2200 SF building to house restrooms, a storage room, and concessions. The building is a wood post-framed structure with metal panel exterior walls. Additional area is covered by a roof overhang on the north and west sides of the building. The building will not be heated or cooled, but exhaust fans will be provided in the restrooms and concessions spaces. See outside link.
Provide engineering services for a study of the cincinnati dayton road shaker creek sewer and the greater shaker creek drainage shed.
Posted Date
Jan 7, 2026
Due Date
Feb 20, 2026
Release: Jan 7, 2026
Close: Feb 20, 2026
Provide engineering services for a study of the cincinnati dayton road shaker creek sewer and the greater shaker creek drainage shed.
AvailableHighlands County seeks bids to rehabilitate the Catfish Creek Road bridge over Catfish Creek, including scour protection and countermeasures to maintain the bridge’s structural integrity. A non-mandatory pre-bid meeting is scheduled, and bids may be submitted electronically via the county’s designated portal or by hard copy as specified. Bids are due by 3:30 PM EST on February 3, 2026.
Posted Date
Jan 2, 2026
Due Date
Feb 3, 2026
Release: Jan 2, 2026
Close: Feb 3, 2026
Highlands County seeks bids to rehabilitate the Catfish Creek Road bridge over Catfish Creek, including scour protection and countermeasures to maintain the bridge’s structural integrity. A non-mandatory pre-bid meeting is scheduled, and bids may be submitted electronically via the county’s designated portal or by hard copy as specified. Bids are due by 3:30 PM EST on February 3, 2026.
Surface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →