The complete installation of the OaklandConnect fiber infrastructure, 39,000 LF of Furnish and Install MicroDucts by Microtrench; 18,800 LF of Furnish And Install MicroDucts by OpenTrench; 2,305 LF of Furnish And Install MicroDucts in Conduit; 420 LF of Furnish And Install New Conduit (2"); 100 LF of Furnish And Install New Conduit (3") on Wall; 4 EA of Upgrade Existing Pull Box to a N48E Pull Box; 51,700 LF of Furnish And Install 288-Strand Fiber Optic Trunk Cable in Microduct; 19 EA of Furnish and Install Fiber Termination Panel; 8 EA of Furnish and Install Fiber Termination Panel (CAI/Hub); 12,520 ton of Pavement Restoration - Asphalt (4" deep); 290 CY of Pavement Restoration - Concrete (6" deep).