Work includes expand and upgrade the existing electric vehicle charging infrastructure at playhouse park through the installation of new level 2 electric vehicle supply equipment, replacement of four existing level 2 chargers, associated electrical infrastructure, foundations, conduit, conductors, panelboard equipment, load management equipment, pavement/parking markings, and related site restoration; (10) 48a level 2 dual-port ev chargers (joint #ixp-e48-dual). ; (10) evse pedestals (joint #pab-05), painted green; (5) concrete foundations for evse pedestals, 48"l x 18"w x 12"d; (1) panelboard 'p2ev', 400a, 42ckt, 65kaic, nema3r, w/ (10) 60a circuit breakers and spd. See attached file.