School DistrictMS
Posted
Aug 24, 2026
Sep 22, 2026
Phase IV Bleacher Expansion RFP
Work includes bleacher expansion.
Description: Consists of Site grading and installation of infrastructure for the campground park expansion including sanitary sewer, water main, storm sewer, storm detention pond, and various appurtenances.
Other · MI, US
Original attachments and procurement documents tied to this bid.
Adjacent opportunities open for bidding right now.
School DistrictMS
Posted
Aug 24, 2026
Sep 22, 2026
Work includes bleacher expansion.
CityCA
Posted
Sep 8, 2026
Oct 14, 2026
Work includes expand and upgrade the existing electric vehicle charging infrastructure at playhouse park through the installation of new level 2 electric vehicle supply equipment, replacement of four existing level 2 chargers, associated electrical infrastructure, foundations, conduit, conductors, panelboard equipment, load management equipment, pavement/parking markings, and related site restoration; (10) 48a level 2 dual-port ev chargers (joint #ixp-e48-dual). ; (10) evse pedestals (joint #pab-05), painted green; (5) concrete foundations for evse pedestals, 48"l x 18"w x 12"d; (1) panelboard 'p2ev', 400a, 42ckt, 65kaic, nema3r, w/ (10) 60a circuit breakers and spd. See attached file.
School DistrictFL
Posted
Jun 7, 2026
Sep 16, 2026
Work includes 02 82 asbestos abatement; 07 spray foam insulation; 08 10 doors, frames, hardware & specialties; 10 51 lockers & benches; 11 61 stage curtains.
Special DistrictCA
Posted
Aug 30, 2026
Sep 24, 2026
work consists of replacing approx. 127 1" and 2 2" water services along with their respective meter boxes and lids and surface.