CityFL
Posted
Jun 16, 2026
Dec 31, 2026
Doors and Windows Replacement at Fire Stations 2, 9, and 12-D2/5
he Work consists of furnishing all materials, tools, labor, staging, signage, traffic control, any and all necessary tests, shop drawing, permits, plans, and equipment to remove existing doors and windows, then properly dispose, furnish, and install new hurricane wind impact doors and windows. At Fire Station No. 2, remove and properly dispose of four (4) existing Trane HVAC units and replace them with new units. At Fire Station No. 9, remove and properly dispose of two (2) existing HVAC roof units and replace them with new units. For funding purposes, the Projects shall be bid separately as follows: Project 40-B213210 shall consist of the work on the Fire Station Number two (2), Project 40-B213209, shall include of work on the Fire Station Number nine (9), and Project 40-B223212 shall involve the work the Fire Station Number twelve (12).