CityCA
Jul 21, 2026
Closes
Aug 26, 2026
ADA Curb Ramps R25-01
Clearing and grubbing; 35 ea sawcut, remove, and construct ada curb ramp / retaining curb / truncated dome / sidewalk; 760 sf sawcut, remove, and reconstruct sidewalk; relocate existing sign and post