Special DistrictTX
Posted
Sep 25, 2026
Oct 22, 2026
TRINITY RIVER AUTHORITY: ROCRWS Phase 2 Expansion CMAR - PP#6 - Aeration Blower Equipment Procurement (RFP)
Trinity River Authority of Texas is soliciting proposals for Package No. 6, aeration blower equipment procurement, under the ROCRWS Phase 2 Expansion CMAR project. The broader Red Oak Creek Regional Wastewater System expansion increases capacity from 6.0 to 12.0 million gallons per day, with Phase 2 increasing it from 8.0 to 12.0 million gallons per day. The posting schedules a pre-bid meeting and site walk at the Red Oak facility and instructs attendees to bring protective equipment.
