CityCA
Posted
Sep 17, 2026
Oct 15, 2026
Peninsula Avenue and Delaware Street Traffic Signal Modification Project
Work includes 480 SF asphalt paving and base removal; 1,460 SF concrete removal; 5 EA sign post and foundation removal; 1 LS pavement marking removal; 2 EA streetlight pull box replacement; 1 EA streetlight pull box reconstruction (in existing concrete); 850 SF concrete sidewalk; 3 EA curb ramps (all types); 250 LF type A concrete curb and gutter; 18 LF type C concrete vertical curb; 4 SF valley gutter. See outside link.
