Closing soon

Traffic Management Enhancements, Phase VI - MLK Corridor

Description: Provide traffic management enhancements, phase VI. Description: 1 LS of removal of improvements; adjust to grade of improvements; 1 EA of EX FH valve (TBR&R); 1272 SY of type 5 aggregate for base (4 in. Thick); 38 ton of bituminous pavement mixture PG64-22, (BP-1); 278 SY of concrete pavement (8 in. Non-reinf); 620 LF of integral curb (6 in. Height and under) type b; traffic control; maintenance of traffic control items; mobilization; contractor furnished surveying and staking; 1860 lbs of epoxy coated tie bars (drilled and installed); 448 SY of concrete curb ramp; 343 SF of truncated domes; 569 SY of concrete sidewalk, 5 in; 1395 LF of acrylic waterborne pavement marking paint, 24 in, white; 1 EA of relocated light pole; 15 EA of signal head, type 3S, LED; signal head, type 3B, LED.

Buyer
City of Saint Louis

City · MO, US

Released
Sep 16, 2026
Closes
Oct 20, 2026(12 days left)

Files

Original attachments and procurement documents tied to this bid.

No files attached to this RFP.

Many agencies add documentation later or require FOIA requests. Starbridge can automatically retrieve these files for you.

Request File Retrieval
See your top accountsScan your site in seconds. Starbridge identifies your ICP and surfaces emerging opportunities from board meetings, job changes, new grants, contract expirations, RFPs, and more.
See your top 10 accounts