Traffic Management Enhancements, Phase VI - MLK Corridor
Provide traffic management enhancements, phase VI. Description: 1 LS of removal of improvements; adjust to grade of improvements; 1 EA of EX FH valve (TBR&R); 1272 SY of type 5 aggregate for base (4 in. Thick); 38 ton of bituminous pavement mixture PG64-22, (BP-1); 278 SY of concrete pavement (8 in. Non-reinf); 620 LF of integral curb (6 in. Height and under) type b; traffic control; maintenance of traffic control items; mobilization; contractor furnished surveying and staking; 1860 lbs of epoxy coated tie bars (drilled and installed); 448 SY of concrete curb ramp; 343 SF of truncated domes; 569 SY of concrete sidewalk, 5 in; 1395 LF of acrylic waterborne pavement marking paint, 24 in, white; 1 EA of relocated light pole; 15 EA of signal head, type 3S, LED; signal head, type 3B, LED.