The City of Moses Lake solicits interest from consulting firms with expertise in Civil Engineering Design. Preliminary engineering work of this project is expected to begin January 2027 with project ready for construction advertisement by May 14, 2027. Project Description The work to be performed by the CONSULTANT consists of preparing preliminary engineering design for improvements to Pioneer Way from SR17 to SR171, an arterial street. The proposed improvements include pavement grinding and overlay, ADA compliant ramps and bus stops, and the addition of sidewalk. The major features of the project are as follows: Approximately 1.8 miles of grind and overlay of drive lanes. ADA upgrades to ramps and bus stops as necessary. New sidewalk on the east side of Pioneer from Sharon Ave to SR17 (Clover). Environmental & R/W documentation with preparation of permit applications if necessary. Pavement materials testing as needed for roadway. Construction phasing, sequencing, property access plans, and site-specific traffic control plans. Utility adjustment and relocation coordination as needed. A copy of the Grant application and award letter are available by request.