Discover Opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Work includes demolition of existing secondary clarifiers no. 3 and 4 and piping as shown on contract drawings; provide and install all erosion control measures as shown in the contract drawings; excavation, backfilling, and restoration; construction of two new, cast-in-place concrete, 60-ft diameter secondary clarifier tanks. Clarifier tank components to include, but not limited to, new 304ss mechanism, control panel, center unit drive, and frp baffles and weirs; provide new 16" clarifier influent, 14" clarifier effluent, 8" sludge, and 6" scum and 6" drain below grade piping between the new clarifier and existing tie-in locations as indicated on contract drawings; provide new 8" ras and 6" was below grade piping per contract drawings;
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Work includes demolition of existing secondary clarifiers no. 3 and 4 and piping as shown on contract drawings; provide and install all erosion control measures as shown in the contract drawings; excavation, backfilling, and restoration; construction of two new, cast-in-place concrete, 60-ft diameter secondary clarifier tanks. Clarifier tank components to include, but not limited to, new 304ss mechanism, control panel, center unit drive, and frp baffles and weirs; provide new 16" clarifier influent, 14" clarifier effluent, 8" sludge, and 6" scum and 6" drain below grade piping between the new clarifier and existing tie-in locations as indicated on contract drawings; provide new 8" ras and 6" was below grade piping per contract drawings;
Posted Date
Nov 21, 2025
Due Date
Dec 18, 2025
Release: Nov 21, 2025
Close: Dec 18, 2025
Work includes demolition of existing secondary clarifiers no. 3 and 4 and piping as shown on contract drawings; provide and install all erosion control measures as shown in the contract drawings; excavation, backfilling, and restoration; construction of two new, cast-in-place concrete, 60-ft diameter secondary clarifier tanks. Clarifier tank components to include, but not limited to, new 304ss mechanism, control panel, center unit drive, and frp baffles and weirs; provide new 16" clarifier influent, 14" clarifier effluent, 8" sludge, and 6" scum and 6" drain below grade piping between the new clarifier and existing tie-in locations as indicated on contract drawings; provide new 8" ras and 6" was below grade piping per contract drawings;
AvailableThe Borough of Caldwell (Essex County, NJ) is soliciting sealed bids for the Clarifier Retrofit Project at the Caldwell Wastewater Treatment Plant, including partial demolition and modification to existing sludge collector equipment in two final clarifiers. Bids are due to the Borough Clerk on December 18, 2025 at 11:00 AM prevailing time.
Posted Date
Nov 13, 2025
Due Date
Dec 18, 2025
Release: Nov 13, 2025
Close: Dec 18, 2025
The Borough of Caldwell (Essex County, NJ) is soliciting sealed bids for the Clarifier Retrofit Project at the Caldwell Wastewater Treatment Plant, including partial demolition and modification to existing sludge collector equipment in two final clarifiers. Bids are due to the Borough Clerk on December 18, 2025 at 11:00 AM prevailing time.
AvailableThe San Antonio River Authority (SARA) issued an Invitation to Bid (ITB) for structural, process, and electrical rehabilitation of Secondary Clarifiers No. 27 and No. 37 at the Salitrillo Wastewater Treatment Plant in Converse, Texas. The work includes demolition and replacement of clarifier mechanisms, concrete repairs, installation of isolation gates, and associated electrical/instrumentation upgrades; the engineer's estimate is approximately $4 million. Required bid submittals include a pricing sheet, bid bond, financial statements, experience examples, insurance/surety letters, and other solicitation attachments; the posted response deadline is January 8, 2026.
Posted Date
-
Due Date
Jan 8, 2026
Close: Jan 8, 2026
The San Antonio River Authority (SARA) issued an Invitation to Bid (ITB) for structural, process, and electrical rehabilitation of Secondary Clarifiers No. 27 and No. 37 at the Salitrillo Wastewater Treatment Plant in Converse, Texas. The work includes demolition and replacement of clarifier mechanisms, concrete repairs, installation of isolation gates, and associated electrical/instrumentation upgrades; the engineer's estimate is approximately $4 million. Required bid submittals include a pricing sheet, bid bond, financial statements, experience examples, insurance/surety letters, and other solicitation attachments; the posted response deadline is January 8, 2026.
The San Antonio River Authority has issued an Invitation for Bids (ITB) for the Salitrillo Wastewater Treatment Plant Secondary Clarifier Rehabilitation to perform structural, process, and electrical rehabilitation of Secondary Clarifiers No. 27 and No. 37 at the Salitrillo WTP in Converse, TX. The engineer's estimate is approximately $4 million (HigherGov lists an AI estimate range $3.6M–$4.4M). The solicitation and all attachments (IFB main document, sample contract, plans, pricing sheet, and technical specifications) are hosted on the Authority’s Bonfire portal; questions are due 2025-12-23 and proposals are due 2026-01-08.
Posted Date
Dec 9, 2025
Due Date
Jan 8, 2026
Release: Dec 9, 2025
Close: Jan 8, 2026
The San Antonio River Authority has issued an Invitation for Bids (ITB) for the Salitrillo Wastewater Treatment Plant Secondary Clarifier Rehabilitation to perform structural, process, and electrical rehabilitation of Secondary Clarifiers No. 27 and No. 37 at the Salitrillo WTP in Converse, TX. The engineer's estimate is approximately $4 million (HigherGov lists an AI estimate range $3.6M–$4.4M). The solicitation and all attachments (IFB main document, sample contract, plans, pricing sheet, and technical specifications) are hosted on the Authority’s Bonfire portal; questions are due 2025-12-23 and proposals are due 2026-01-08.
Surface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis