Summary
Work consists of, but is not limited to, the demolition and disposal of existing mechanical components and associated electrical/ instrumentation for all four (4) train a clarifiers. Replacement of existing mechanical components and associated electrical/ instrumentation for all four (4) train a clarifiers, as shown on the contract drawings. Concrete repair and structural modifications of the existing four (4) train a clarifiers, as required to install the new clarifier mechanisms, as shown on the contract drawings. Cleaning and recoating of the interior of the existing four (4) train a clarifiers, as shown on the contract drawings. Cleaning, cctv inspection, and rehabilitation of the existing influent (inf), effluent (eff), return activated sludge (ras), and waste activated sludge (was) lines.