CityMN
Jul 23, 2026
Closes
Aug 13, 2026
2026 Forcemain Improvements
Work includes approx 4,553 LF 14" forcemain by directional bore; 1 LS temporary erosion and sediment control; 360 LF 24" casing (trenchless) by jack and bore;
Description: Work includes to install approx 9,941 (LF) of new 12" watermain PVC DR18 by open cut, install approx 11,732 (LF) of new 10" forcemain PVC DR18 by open cut, install approx 2,199 LF of new 12" forcemain HDPE DR-11 by horizontal directional drill (HDD), install approx 341 LF of new 16" watermain HDPE DR-11 by horizontal directional drill (HDD), install approx 310 (LF) of new 10" forcemain PVC DR18 by jack and bore, tie in of 10" forcemain into existing wastewater system, install associated fittings, valves, and accessories with new forcemain installation.
City · SC, US
Original attachments and procurement documents tied to this bid.
Adjacent opportunities open for bidding right now.
CityMN
Jul 23, 2026
Closes
Aug 13, 2026
Work includes approx 4,553 LF 14" forcemain by directional bore; 1 LS temporary erosion and sediment control; 360 LF 24" casing (trenchless) by jack and bore;
Jul 23, 2026
Closes
Aug 17, 2026
Qualified artists, designers, fabricators, and contractors to provide design, fabrication, and installation services for a decorative archway and bollard(s). The gateway feature will enhance the pedestrian connection from Miracle Strip Parkway to The Landing Park, serving as a welcoming entrance and distinctive landmark that reflects the character and identity of the Fort Walton Beach community.
CityOH
Aug 10, 2026
Closes
Sep 9, 2026
Professional services for a construction manager at risk (CMAR).
CityCO
Jul 24, 2026
Closes
Aug 25, 2026
Seeks the consultant's expert guidance in shaping a varied and context-sensitive corridor.
Procurement and program contacts connected to Town of Ridgeland.