Discover Opportunities months before the RFP drops
Learn more →Retrieving RFP details
Verified names, emails & phone numbers
AI-predicted best buyers in the org
Auto-sync to Salesforce & HubSpot
Access the largest public sector contact database
See which competitors are likely to bid
Line-item pricing breakdowns
Contract expiration map of your TAM
Get complete source documentation & analysis
Town of Richford
The Town of Richford requests bids for construction of a new booster pump station and approximately 1,150 LF of 8" waterline plus additional waterlines, services, hydrants, and appurtenances. Bids must be submitted electronically and are due December 17, 2025 at 1:00 PM local time; bidders must comply with DBE, bonding, BABAA, and Davis-Bacon requirements.
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Richford Economic Advancement Corporation (REAC)
Construction of the following Project: Golf course Road Waterline and Booster Pump Station. The Project includes the following Work: A new water booster pump station, 1,150 LF of new 8” PVC C900 waterline, 850 LF of new 4” PVC C900 waterline, 410 LF of new 2” CTS waterline, 660 LF of new 3/4" CTS water services, 2 fire hydrants, 2 flushing hydrants, and all necessary appurtenances to complete the construction of the new booster pump station, waterline, and services.
Posted Date
Nov 19, 2025
Due Date
Dec 17, 2025
Release: Nov 19, 2025
Richford Economic Advancement Corporation (REAC)
Close: Dec 17, 2025
Construction of the following Project: Golf course Road Waterline and Booster Pump Station. The Project includes the following Work: A new water booster pump station, 1,150 LF of new 8” PVC C900 waterline, 850 LF of new 4” PVC C900 waterline, 410 LF of new 2” CTS waterline, 660 LF of new 3/4" CTS water services, 2 fire hydrants, 2 flushing hydrants, and all necessary appurtenances to complete the construction of the new booster pump station, waterline, and services.
AvailableCity of Charlotte
Charlotte Water is soliciting Statements of Qualifications from engineering firms to provide professional engineering services for the Statesville Road Booster Pump Station Project, which will enhance system reliability and capacity in the 978 Pressure Zone. Scope includes evaluation, design, permitting, bidding support, and construction‑phase services for a new booster pump station.
Posted Date
Nov 12, 2025
Due Date
Dec 19, 2025
Release: Nov 12, 2025
City of Charlotte
Close: Dec 19, 2025
Charlotte Water is soliciting Statements of Qualifications from engineering firms to provide professional engineering services for the Statesville Road Booster Pump Station Project, which will enhance system reliability and capacity in the 978 Pressure Zone. Scope includes evaluation, design, permitting, bidding support, and construction‑phase services for a new booster pump station.
AvailableTown of Groton
This solicitation is for construction of a booster pump station including concrete, masonry, roofing, mechanical systems, pumps, generator, instrumentation, electrical, and related work. The aggregator listing does not host bid documents and directs users to the original SmartBidNet posting for full documentation.
Posted Date
Nov 5, 2025
Due Date
Nov 26, 2025
Release: Nov 5, 2025
Town of Groton
Close: Nov 26, 2025
This solicitation is for construction of a booster pump station including concrete, masonry, roofing, mechanical systems, pumps, generator, instrumentation, electrical, and related work. The aggregator listing does not host bid documents and directs users to the original SmartBidNet posting for full documentation.
AvailableEdgecombe County
The project includes the following work: 1. replace booster pump station building w/ associated piping. 2. permanent back-up generator. 3. SCADA. 4. (3) skid mounted booster pumps. 5. chemical feed system. 6. (2) 16 x 16 x 12-inch tapping sleeves with 12-inch valves. 7. earthwork. 8. 12 FT gravel drive.
Posted Date
Nov 13, 2025
Due Date
Dec 16, 2025
Release: Nov 13, 2025
Edgecombe County
Close: Dec 16, 2025
The project includes the following work: 1. replace booster pump station building w/ associated piping. 2. permanent back-up generator. 3. SCADA. 4. (3) skid mounted booster pumps. 5. chemical feed system. 6. (2) 16 x 16 x 12-inch tapping sleeves with 12-inch valves. 7. earthwork. 8. 12 FT gravel drive.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →Verified names, emails & phone numbers
AI-predicted best buyers in the org
Auto-sync to Salesforce & HubSpot
Access the largest public sector contact database
See which competitors are likely to bid
Line-item pricing breakdowns
Contract expiration map of your TAM
Get complete source documentation & analysis