Closing soon

Town Beach Seawall

Description: The work shall include, but shall not be limited to, the following: Repair approx. twenty-five (25) linear feet of the existing granite seawall; Reinstall one (1) large, displaced granite slab located at the base of the seawall; Fill and compact voids between existing granite stones using suitable stone, riprap, or other approved materials necessary to restore the stability and structural integrity of the seawall; Reset, reposition, or realign adjacent granite stones as necessary to provide a stable and secure wall; Preserve existing granite materials wherever reasonably practicable; Remove and properly dispose of construction debris and unsuitable materials generated by the work; Maintain a safe work area and protect the public, Town property, and existing structures from damage during construction; Restore the work area to a clean, safe, and satisfactory condition upon completion; Perform all incidental work necessary to provide a complete and functional seawall repair.

Buyer
Town of Warren

City · RI, US

Released
Sep 28, 2026
Closes
Oct 22, 2026(3 days left)

RFP documents

Solicitation files and supporting documents for this bid.

  • Sea WallPDF
See your top accountsScan your site in seconds. Starbridge identifies your ICP and surfaces emerging opportunities from board meetings, job changes, new grants, contract expirations, RFPs, and more.
See your top 10 accounts