Discover opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
The City of Los Angeles, Bureau of Engineering, is seeking qualifications for pre-design and design services for the Lighthouse Street Pedestrian Bridge over Ballona Lagoon. The project scope encompasses a Pre-Design Report, geotechnical engineering, bridge inspection, and various analyses including historic resource evaluation. Proposals must include subconsultant registration with RAMP, a Non-Collusion Affidavit, and a Cost Proposal Worksheet, as this project is part of the Pre-Qualified On-Call Bridge/Civil Engineering Consultants List.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
No files attached to this RFP.
Many agencies add documentation later or require FOIA requests. Starbridge can automatically retrieve these files for you.
Rehabilitation and repair services for Governors Island Pedestrian Bridge and Fender Wharf, including structural repairs, demolition of boat docks, and installation of fixtures.
Posted Date
Dec 23, 2025
Due Date
Feb 5, 2026
Release: Dec 23, 2025
Close: Feb 5, 2026
Rehabilitation and repair services for Governors Island Pedestrian Bridge and Fender Wharf, including structural repairs, demolition of boat docks, and installation of fixtures.
AvailableConstruction of a new covered and enclosed pedestrian bridge; construction of bridge landings, including covered stairs, and covered ADA compliant, concrete ramps; installation of temporary and permanent concrete flatwork and landscaping for access to and around the landings and bridge; resetting of overhead sign structure; modifications to existing wayfinding signage.
Posted Date
Dec 12, 2025
Due Date
Feb 6, 2026
Release: Dec 12, 2025
Close: Feb 6, 2026
Construction of a new covered and enclosed pedestrian bridge; construction of bridge landings, including covered stairs, and covered ADA compliant, concrete ramps; installation of temporary and permanent concrete flatwork and landscaping for access to and around the landings and bridge; resetting of overhead sign structure; modifications to existing wayfinding signage.
AvailableProvide bridge over the calumet river rehabilitation.
Posted Date
Jan 15, 2026
Due Date
Feb 25, 2026
Release: Jan 15, 2026
Close: Feb 25, 2026
Provide bridge over the calumet river rehabilitation.
AvailableBridge rehabilitation including partial replacement of retaining wall, barrier repairs and replacement of pedestrian fencing.
Posted Date
Jan 9, 2026
Due Date
Feb 6, 2026
Release: Jan 9, 2026
Close: Feb 6, 2026
Bridge rehabilitation including partial replacement of retaining wall, barrier repairs and replacement of pedestrian fencing.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis