Discover Opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Construction of a new covered and enclosed pedestrian bridge; construction of bridge landings, including covered stairs, and covered ADA compliant, concrete ramps; installation of temporary and permanent concrete flatwork and landscaping for access to and around the landings and bridge; resetting of overhead sign structure; modifications to existing wayfinding signage.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
No files attached to this RFP.
Many agencies add documentation later or require FOIA requests. Starbridge can automatically retrieve these files for you.
The City of Los Angeles, Bureau of Engineering, is seeking qualifications for pre-design and design services for the Lighthouse Street Pedestrian Bridge over Ballona Lagoon. The project scope encompasses a Pre-Design Report, geotechnical engineering, bridge inspection, and various analyses including historic resource evaluation. Proposals must include subconsultant registration with RAMP, a Non-Collusion Affidavit, and a Cost Proposal Worksheet, as this project is part of the Pre-Qualified On-Call Bridge/Civil Engineering Consultants List.
Posted Date
Dec 2, 2025
Due Date
Jan 27, 2026
Release: Dec 2, 2025
Close: Jan 27, 2026
Premium
Access the largest public sector contact database
The City of Los Angeles, Bureau of Engineering, is seeking qualifications for pre-design and design services for the Lighthouse Street Pedestrian Bridge over Ballona Lagoon. The project scope encompasses a Pre-Design Report, geotechnical engineering, bridge inspection, and various analyses including historic resource evaluation. Proposals must include subconsultant registration with RAMP, a Non-Collusion Affidavit, and a Cost Proposal Worksheet, as this project is part of the Pre-Qualified On-Call Bridge/Civil Engineering Consultants List.
Pedestrian bridge construction. This project consists of the construction of a pre-fabricated steel pedestrian bridge approx 260' length at the end of the existing boardwalk in Johnson Park. Construction includes clearing & grubbing, grading, erosion control, drainage, plazas, concrete and paver sidewalk, boardwalk, gateway structures and other items of work.
Posted Date
-
Due Date
Jan 28, 2026
Close: Jan 28, 2026
Pedestrian bridge construction. This project consists of the construction of a pre-fabricated steel pedestrian bridge approx 260' length at the end of the existing boardwalk in Johnson Park. Construction includes clearing & grubbing, grading, erosion control, drainage, plazas, concrete and paver sidewalk, boardwalk, gateway structures and other items of work.
AvailablePedestrian bridge construction. This project consists of the construction of a pre-fabricated steel pedestrian bridge approx 260' length at the end of the existing boardwalk in Johnson Park. Construction includes clearing & grubbing, grading, erosion control, drainage, plazas, concrete and paver sidewalk, boardwalk, gateway structures and other items of work.
Posted Date
-
Due Date
Jan 28, 2026
Close: Jan 28, 2026
Pedestrian bridge construction. This project consists of the construction of a pre-fabricated steel pedestrian bridge approx 260' length at the end of the existing boardwalk in Johnson Park. Construction includes clearing & grubbing, grading, erosion control, drainage, plazas, concrete and paver sidewalk, boardwalk, gateway structures and other items of work.
AvailableChase Brook Park restoration and pedestrian bridge project. Removal of brick walk way, trees, vegetation, installation of timber piles for pedestrian bridge, construction of pedestrian bridge, vegetative planting, coir logs for bank stabilization, site grading park walkways, installation of benches, picnic tables, & more
Posted Date
Dec 3, 2025
Due Date
Dec 19, 2025
Release: Dec 3, 2025
Close: Dec 19, 2025
Chase Brook Park restoration and pedestrian bridge project. Removal of brick walk way, trees, vegetation, installation of timber piles for pedestrian bridge, construction of pedestrian bridge, vegetative planting, coir logs for bank stabilization, site grading park walkways, installation of benches, picnic tables, & more
Surface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →Premium
Get complete source documentation & analysis